Pilz PSSu H DN Manual de usuario Pagina 20

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 19
5.2 Installing the head module
5 Installation
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
5-2
5.2Installing the head module5200Installing the head module5-][Montage Kopfmodul
Prerequisite:
The mounting rail must be installed.
Procedure:
Install an end bracket to the left of the head module or leave enough
space for one.
Slot the groove on the head module on to the mounting rail from be-
low [1].
Push the head module back [2] until you hear it lock into position.
Schematic representation:
[2]
[1]
Vista de pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 30 31

Comentarios a estos manuales

Sin comentarios