Pilz PSENvip RL D P Manual de usuario Pagina 144

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 148
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 143
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]
12-1
12.1 Checklist
12 Appendix
1212000AppendixAppendix12-12.1Checklist12100Checklist12-Anhang_Checkliste
The following check list is intended as a guide to provide support when
commissioning and recommissioning the PSENvip and when carrying
out the regular inspection as required.
Please note that the check list is not intended to replace the plant-spe-
cific safety analysis required for commissioning/recommissioning, nor
the resulting inspections and actions.
We recommend that you keep the completed check list and store it with
the machine documentation for reference.
INFORMATION
Commissioning, recommissioning and the regular inspection
may only be carried out by qualified personnel.
No. Action OK Not
OK
Remarks
1 Check the category/standards
Does the category of the PSENvip match the cate-
gory required for the plant/machine?
Have the standards applicable for the plant/machine
been considered?
2 Check the ambient conditions for PSENvip
Are the technical details of the PSENvip complied
with?
3 Check the wiring of the PSENvip
Are all the electrical connections to the PSENvip
wired correctly?
Do the power supply for generating the 24 V supply
voltage and the voltages to the inputs on the PSEN-
vip comply with the regulations for safe electrical
isolation?
Are the cables adequately shielded?
Vista de pagina 143
1 2 ... 139 140 141 142 143 144 145 146 147 148

Comentarios a estos manuales

Sin comentarios