
6.2 Preparing for operation
6 Commissioning
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
6-2
6.2Preparing for operation6200Preparing for operation6-
6.2.1 Download modified project to the PNOZmulti safety system
Download modified project to the PNOZmulti safety system6-Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA
As soon as an additional expansion module has been connected to the
system, the project must be amended using the PNOZmulti Configura-
tor. Proceed as described in the operating instructions for the base unit.
6.2.2 Connection
Connection6-Betriebsbereitschaft herstellen
Relay outputs
Feedback loop
NOTICE
For the commissioning and after every program change, you
must check whether the safety devices are functioning correctly.
Redundant
Single
Feedback loop Redundant output
Contacts from external contactors
O1 (3)
K1
L1
N
K2
14 (34)
13 (33)
23 (43)
24 (44)
O0 (2)
O1 (3)
K1
L1
N
K2
14 (34)
13 (33)
23 (43)
24 (44)
O0 (2)
O1 (3)
K1
L1
N
K2
14 (34)
13 (33)
23 (43)
24 (44)
O0 (2)
L+
I0
Comentarios a estos manuales